| |
|
| |
M. Lisa Labree, P.S.M. |
|
EDUCATION
|
|
|
|
Registered Professional Land Surveyor
#5445, (Florida) 1995
|
|
AFFILIATIONS
|
|
|
|
Florida Land Surveyors Council |
|
EXPERIENCE
|
|
|
02/92 to Present |
Harpster Engineering & Surveying, Inc.
Daytona Beach, Florida |
|
|
Professional Land Surveyor and Office Manager
|
|
|
Field Work as Party Chief (Manual Total
Station and Automatic Level); Run benchmarks; Prepare Legal Descriptions,
Boundary and Topographic Surveys, Plot Plans; stake-out for Construction
and Mortgage Surveys; Prepare FEMA forms for Flood Insurance; Prepare
Conceptual Site Plans; Prepare Site Plan submittal to agencies St. Johns;
DEP; HRS, Volusia County; City of Daytona Beach; City of Ormond Beach;
Flagler County; City of Edgewater; Riparian Rights and Submerged Land
Leases; |
|
|
MAJOR PROJECTS Coronado Paint
Edgewater
Temple Beth EL Ormond Beach
ARC (Association of Retarded Citizens)
A Condominium Daytona Beach
FPL Northeast Division Control Center
-
Daytona Beach
Daytona Water Treatment Plant
- Daytona Beach
|
|
|
|
|
7/88 to 02/92 |
Upham, Inc.
Ormond Beach, Florida |
|
|
CAD Operator/Technician
|
|
|
Interpolating Field Notes and Topographic
Surveys; Preparing Legal Descriptions, Mortgage and Right of Way Surveys,
Subdivision Plats, and Condominium Plats; and drafting in all aspects of
surveying. |
|
03/88 to 07/88 |
Zev Cohen & Associates, Inc.
Ormond Beach, Florida |
|
|
Engineering Technician
|
|
|
Graphic illustrations for various
presentations; revising Final Site Plans and preparing Conceptual Site
Plans; and various drafting. |
|
02/87 to 03/88 |
Greiner, Inc.
Orlando, Florida |
|
|
Engineering Technician Level 3
|
|
|
Exhibits for Site Feasibility Studies,
Slide Presentations, and Graphic Illustrations for various presentations
and meetings; Preparing Legal Descriptions; Interpolating Topographic
Surveys; Designing Conceptual Site Plans; coordinating a Land Development
Brochure; drafting in all Phases Commercial/Residential-Development/
Construction. |
|
|
MAJOR PROJECTS Bartow Municipal Airport
Orlando International Airport
Epcot Parking Expansion |
|
10/86 02/87 |
Greiner, Inc.
Tampa, Florida |
|
|
Engineering Technician Level 2
|
|
|
Final preparations for Site Plans;
Drafting in all Phases of Commercial |
|
|
MAJOR PROJECT Largo Business Park |
|
06/80 08/86 |
Land Engineering Company
Longwood, Florida |
|
|
Site Planner/Senior Technician
|
|
|
Interpolating Survey notes and Topographic
Surveys; Preparing Legal Descriptions, Subdivision Plats, and Mortgage
Surveys; Coordinating and organizing submittals; Attending DRC meetings
with City and County agencies; Inspecting As-Builts; Drafting in all
Phases Residential/Industrial Development/Final. |
|
|
MAJOR PROJECT Deer Run |